Franklin Park Inclusive Playground
Trenton, NJ
Trenton's first completely inclusive playground, with ramped access, rubber surfacing, an inclusive spinner, sensory play, and a quiet grove.
This research record does not yet establish a specific inclusion benefit. General park amenities do not confirm accessible equipment, routes, or facilities.
What to Expect
Read more about this location
Trenton unveiled the rebuilt Franklin Park playground on July 10, 2026. The design provides curb-cut access, poured rubber surfacing, a mostly ramped main structure, transfer stations, tandem and ground-level play, music and sensory panels, a quiet grove, and a roll-on inclusive spinner.
Accessibility
Detailed accessibility information has not been confirmed.
Contact the venue directly about the specific entrance, mobility, restroom, sensory, or communication supports your family needs.
Location
1000 Franklin Street
Trenton, NJ, 08610
Other options nearby

Veterans Park North Entrance Inclusive Children's Activity Center
Access information not yet established
Large inclusive play area at Veterans Park North Entrance with a big children's activity center, smaller play areas, a pavilion, comfort station, and connected walking paths.

Accessible and inclusive children's activity center behind Hamilton Township's municipal building with nearby fields and a basketball court.

Mary Moss Playground
Neighborhood playground in Princeton with poured-in-place surfacing, toddler swings, a spray pad, a pavilion, and a paved perimeter path.
Sources & Updates
Source-checked Aug 10, 2026 against 2 public sources
View source and update details
- Last check on record
- Aug 10, 2026
- Sources reviewed
- 2 public sources
Public sources
- Official City Newstrentonnj.org
Verified unveiling and detailed inclusive feature set.
- Official Public Noticetrentonnj.org
Verified address and fully inclusive project scope.
Details checked
- July 10, 2026 opening
- address
- ramped structure
- rubber surface
- inclusive spinner
- quiet and sensory play
What changed
August 10, 2026
Added after nationwide new-opening research; unveiled July 10, 2026.
Accessibility details reflect available public information and dated reports, not an ADA inspection.
